Efabless Logo
MPW-4
Open MPW Shuttle Service

Welcome to the Efabless Open MPW Shuttle Program

MPW-4 is the fourth Open MPW Shuttle providing fabrication for fully open-source projects using the Open PDK announced by Google.

The shuttle provides opportunities for designers to experiment and push the state-of-the-art without having to reconcile the risk associated with the cost of fabrication.

The shuttle program is open to anyone, provided that their project is fully open source and meets the other program requirements. Costs for fabrication, packaging, evaluation boards and shipping are covered by Google for this program.

Project Submission Requirements

The following project requirements must be met in order to qualify for inclusion on the shuttle program:

  • The project must be targeted on the currently-supported Open PDK.
  • The project must be posted on a git-compatible repo and be publicly accessible.
  • The top-level of the project must include a LICENSE file for an approved open-source license agreement. Third-party source code must be identified and source code must contain proper headers. See details here.
  • The repo must include project documentation and adhere to Google's inclusive language guidelines. See details here.
  • The project must be fully open. The project must contain a GDSII layout, which must be reproducible from source contained in the project.
  • Projects must use a common test harness and padframe based on the Caravel repo. New projects should start by duplicating or forking the Caravel User Project repo and implementing their project using the user_project_wrapper. The Caravel repo is configured as a submodule in the project under the ‘caravel’ directory. Note -- you do not need to initialize nor clone the Caravel sub-directory to complete or submit your project. See the project README for further instructions. The projects must be implemented within the user space of the layout and meet all requirements for the Caravel.
  • Projects must successfully pass the Open MPW precheck tool, including LVS and DRC clean using the referenced versions of OpenLane flow. Projects should implement and pass a simulation testbench for their design integrated into Caravel. The Caravel User Project provides an example of how to implement this.

Schedule

  • November 18, 2021: Project submission is OPEN
  • December 31, 2021: Project submission is CLOSED at 23:59 PT
  • December 31, 2021: Wafer fabrication complete, packaging and assembly begins
  • January 31, 2022: Parts and assembled boards shipped to project owners

FAQs

  • See the following page

Timeline

Tapeout: Dec 31, 2021 at 11:59 PT
Delivery: Jan 2022

Status

Closed
on Dec 31, 2021 at 11:59 PT

Process

SKY130A
Skywater 130nm

Participants

3
+ 1 New User

Projects

20
1 from new users

Capacity

20 / 40
50.0 % Undersubscribed
1
Submission
2
Tapeout
3
Fabrication
4
Close
Open
Nov 18, 2021
Tapeout
Dec 31, 2021
Assembly
Dec 31, 2021
Delivery
Jan 31, 2022
`

Loading ...

Loading ...

Loading ...

Loading ...

Update #1
Matt Long | Efabless | Oct 26, 2022

Matt Long Test Shuttle Announcement

Matt Long Test Shuttle Announcement  - Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Integer vitae justo eget magna. Libero id faucibus nisl tincidunt eget. Elit duis tristique sollicitudin nibh. Sem fringilla ut morbi tincidunt augue interdum. Vivamus arcu felis bibendum ut. Quis commodo odio aenean sed adipiscing diam donec. Ac turpis egestas sed tempus urna et. Faucibus a pellentesque sit amet porttitor eget dolor. Odio ut sem nulla pharetra diam sit amet nisl suscipit. Fermentum iaculis eu non diam phasellus vestibulum. Nunc lobortis mattis aliquam faucibus. A diam maecenas sed enim ut sem. Feugiat vivamus at augue eget arcu. Tortor pretium viverra suspendisse potenti nullam ac. Ac turpis egestas sed tempus urna et pharetra pharetra. Urna porttitor rhoncus dolor purus non enim praesent. Sed euismod nisi porta lorem mollis aliquam ut porttitor leo. Et netus et malesuada fames.

Project submission deadline has passed